Phase 2 Improvements
Restoring Reliable Access


Steel Creek successfully completed Phase 2 of a multi-phase roadway improvement project, addressing challenging terrain, severe erosion, and drainage issues that had compromised access along an existing logging and service road. Prolonged wet conditions and excessive stormwater runoff had caused significant rutting, washouts, and roadway deterioration, creating difficult travel conditions, particularly during nighttime operations and inclement weather.
The project involved extensive roadway regrading, stabilization of an existing switchback and culvert crossing, and installation of strategically placed water breaks to redirect stormwater runoff and minimize future erosion. Steel Creek placed five loads of railroad ballast, supplemented with additional stone, to reinforce weakened roadway sections and establish a more stable driving surface. Crews also excavated and removed damaged drainage pipe and accumulated debris, followed by seeding of disturbed areas to support site restoration.
Through practical construction solutions and careful attention to drainage and roadway conditions, Steel Creek transformed deteriorated access areas into a more dependable travel route. The completed improvements demonstrate the company's ability to overcome difficult site conditions while delivering durable infrastructure solutions that improve accessibility, enhance drainage performance, and support continued operations.