828.626.4065

Phase 1 Improvements
Improving Drainage, Access, and Delivering Results


Steel Creek successfully completed Phase 1 of a three-phase infrastructure improvement project designed to enhance stormwater drainage, improve roadway stability, and provide reliable property access. The work focused on addressing surface runoff, strengthening an existing driveway crossing, and implementing practical solutions to reduce erosion and protect the surrounding landscape.
Improvements included the installation of an additional 24-inch drainage culvert, construction of protective headwalls, and cleaning of an existing culvert to restore efficient water flow. Three strategically positioned water breaks were installed to intercept and redirect stormwater runoff, reducing the potential for washouts and damage to the access road. Additional work included selective clearing, debris removal, and backfilling with railroad ballast to create a stable, durable driving surface.
Through careful planning, efficient execution, and attention to site conditions, Steel Creek delivered drainage and access improvements that address immediate challenges while supporting long-term performance. The completed first phase demonstrates the company's commitment to quality workmanship, practical construction solutions, and dependable results.